Skip to main content
New Delhi · Gurgaon
— Builders since MCMXCI —
41 projects on the ledger
35 years in continuous practice

The wall stands
straight. The floor
sits level.

For 35 years, P Kumar Associates has built houses across Delhi NCR — quietly, one site at a time, with the same hands on every floor slab.

The DLF villa — 2024
§ 01 — A practice of one principal

A builder’s practice with a long memory.
Houses built to outlast the people who commissioned them.

About the studio
41
Projects delivered
35
Years in continuous practice
13+
Architects collaborated with
1
Principal · on every site
§ 03 — The workshop

Built on site. Finished in the workshop.

What the workshop produces, alongside each build.
Spec. 01

Doors

Entry, internal, panelled. Sal, teak, sheesham.

For the residence at DLF Phase 4, 2024.

Spec. 02

Windows

Timber, fixed and operable. Glazed to brief.

For the residence at EROS Garden, Faridabad, 2020.

Spec. 03

Cabinetry

Kitchens, wardrobes, built-ins.

For the office fit-out at Wave One, Noida, 2022.

Spec. 04

Chairs

Dining, lounge, occasional. Frame and joinery in-house.

For the residence at Shivalik, 2018.

Spec. 05

Tables

Dining, console, side. Solid tops, drawn to the room.

For the residence at Vasant Vihar, 2014.

Spec. 06

Sofas

Frames built, upholstered to brief.

For the residence at G.K. II, 2014.

Spec. 07

Joinery

Staircases, panelling, trim. The work that closes a room.

For the renovation at Malviya Nagar, 2025.

§ 04 — Featured project

DLF Phase 4 villa, 2023–24.

A DLF Phase 4 villa designed with D.D Roy — among the firm's most recent and most fully documented projects.

Plot area
316 sq yd
Architect
D.D Roy
Delivered
2023–24
Read the case study
§ 05 — The ledger by decade

Four decades, one ledger.

1990s
Founding decade — South Delhi residential roots, first DLF Gurgaon work.
12 projects
2000s
Architect partnerships deepen — Kaushal Sheth, Shah, D.D Roy.
5 projects
2010s
Commercial scale-up — Narendar Mohan Hospital, EDM Bridge, Rajouri Garden.
20 projects
2020s
Largest residential projects to date — DLF Phase 4, EROS Garden Faridabad.
4 projects
§ 06 — The principal

“Every floor slab gets a visit. Every door gets shut. That’s the whole brief.

P. Kumar — Founding principal
On site, DLF Phase 4 — 2023

Work arrives by referral — from architects, past clients, and households for whom “the wall stands straight” is the only credential that matters.